Sources and assumptions
Sanjeevani Vann is an independent proposed concept prepared for strategic discussion. No endorsement, commitment or formal partnership by Adani Foundation, Adani Group, Adani Health City, AIHER, Mayo Clinic or any other institution is implied.
Official strategic-context sources
- Adani announcement, 10 February 2025 - initial Adani Health City campuses in Ahmedabad and Mumbai, including hospitals, medical colleges, transitional care and research; the announcement states an intention for more such campuses.
- Adani Foundation collaboration announcement, 26 June 2025 - academic innovation, clinical research and community-health collaboration with the former DMIHER.
- AIHER convocation announcement, 17 October 2026 - confirms the institution's renamed identity, Wardha location and proximity/linkages to Nagpur.
Promoter-reported site narrative
- Association with the origin of the Chandrabhaga River.
- Teak-forest ecology and large seasonal firefly populations.
- Total land stated as more than 15.5 acres with approximately 1.84 km perimeter.
- Lake / water body behind the existing weir.
These attributes are design premises, not certified environmental, hydrological or title findings. They require independent survey and specialist verification.
Concept and due diligence assumptions
- Working programme: 18 wellness villas, 24 long-stay studios, compact general-doctor / nutrition / therapy consultation, physiotherapy and gym, lakeside spa/dining, sports, herb farms and landscaped surface parking in the base case.
- All plans, areas, sections, elevations, 3D imagery, programme sizes and operating models are conceptual. The R06 investor presentation includes upgraded architectural plans with furniture, functional zoning, dimensions, access logic, scale bars and landscape interfaces.
- Wellness and rehabilitation claims must be reviewed by qualified professionals. Complex diagnostics, emergency treatment and specialist care are referred to licensed partner hospitals.
- The R06 cost model is conceptual: lean INR 48.83 crore, base INR 63.60 crore and premium INR 97.76 crore, excluding land purchase and recoverable taxes. Formal QS validation, market testing, financing and return analysis remain required.
- Certified boundary, title, access, contours, water rights, forest status, environmental permissions, flood behaviour and infrastructure capacity must be established before detailed design.